...
首页> 外文期刊>Australian Viticulture >Water market update for the Murray-Darling Basin
【24h】

Water market update for the Murray-Darling Basin

机译:墨累达令盆地的水市场更新

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

At the beginning of 2010, the northern sections of the Murray-Darling Basin in New South Wales and Southern Queensland experienced very heavy rainfall, which led to localised flooding and a significant volume of run-off that has flowed into the Darling River. Figure 1 shows a map of the rainfall received in December 2009 and the arrows demonstrate the direction of the floodwater flow down the Darling River. This run-off steadily flowed down the Darling over the six weeks to 22 February, assisted by good rainfall along the system, during late January and mid-February. Run-off flows have been entering the Menindee Lakes storage. On 15 January, Waterfind's general security allocations in the Lower Darling were raised to 100%, and the trade between theLower Darling and Murray systems was opened. On 19 January, South Australian Premier Mike Rann and New South Wales Premier Kristina Keneally jointly announced that lOOGL of water that had flowed into the Menindee Lakes from the floods in the northern Murray-Darling Basin was going to be delivered to the Lower Lakes.
机译:2010年初,新南威尔士州和昆士兰州南部的墨累达令盆地北部出现了非常大的降雨,这导致了局部洪水和大量流入达令河的径流。图1显示了2009年12月收到的降雨图,箭头显示了顺着达令河的洪水流向。在1月下旬和2月中旬期间,在整个系统降雨充沛的情况下,到2月22日的6周内,径流一直稳定地流向Darling。径流已进入Menindee Lakes仓库。 1月15日,Waterfind在下达令的一般安全分配提高到100%,并且下达令和Murray系统之间的交易开始了。 1月19日,南澳大利亚州总理迈克·兰恩和新南威尔士州总理克里斯蒂娜·肯尼利共同宣布,从默里-达令盆地北部的洪水流入Menindee湖的水量将流向下湖。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号