...
首页> 外文期刊>Automation >PLCs help upgraded hospital BMS system get on track for 18-month ROI
【24h】

PLCs help upgraded hospital BMS system get on track for 18-month ROI

机译:PLC帮助升级的医院BMS系统步入正轨,实现18个月的投资回报率

获取原文
获取原文并翻译 | 示例
           

摘要

BG Energy Solutions has played an integral role in upgrading the BMS (building management system) at Royal United Hospitals Bath. Based on the installation of client-specified Panasonic PLCs (programmable logic controllers) and newly designed control panels, estates manager, Brian Gubb, estimates that payback will be as little as 18 months due to the impressive energy savings being delivered. As a result, the facility plans to roll out the solution to more areas in the near future Royal United Hospitals Bath, an NHS Foundation Trust, provides acute treatment and care for a catchment population of around 500,000 people in Bath and the surrounding towns and villages of northeast Somerset and west Wiltshire. The 52 acre site offers 565 beds, 17 operating theatres and employs around 4,800 staff.
机译:BG能源解决方案在升级Royal United Hospitals Bath的BMS(建筑物管理系统)中扮演了不可或缺的角色。根据客户指定的松下PLC(可编程逻辑控制器)和新设计的控制面板的安装,资产经理布莱恩·古布(Brian Gubb)估计,由于可节省大量能源,因此投资回收期将短至18个月。因此,该机构计划在不久的将来将解决方案推广到更多地区,NHS Foundation Trust皇家联合医院巴斯将为巴斯及周边城镇和村庄的约50万人的集水区提供紧急治疗和护理萨默塞特郡东北部和威尔特郡西部。这个占地52英亩的场地提供565张床,17个手术室,并拥有约4,800名员工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号