首页> 外文期刊>Automation >SCADA aids compliance
【24h】

SCADA aids compliance

机译:SCADA有助于合规

获取原文
获取原文并翻译 | 示例
       

摘要

AstraZeneca replaced an existing process control system with a SCADA system to achieve compliance with FDA CFR part11 regulations to meet the demands of the American market. AstraZeneca is one of Germany's four leading pharmaceutical research companies with production sites at Wedel, Hamburg and Plankstadt, Heidelberg. At its Plankstadt site the company produces therapeutic drugs in tablet form for anaesthesia, infection and pain control, and also for the treatment of respiratory, cardiovascular and gastrointestinal illnesses, tumours and the central nervous system. The site consists of two plants, which work independently of each other - the S5 Dryer plant houses a fluidised-bed dryer where a variety of tablets are processed. The tablets are then transported to the Cota48 plant to be coated.
机译:阿斯利康用SCADA系统取代了现有的过程控制系统,以达到FDA CFR part11法规的要求,从而满足美国市场的需求。阿斯利康(AstraZeneca)是德国四家领先的制药研究公司之一,生产基地位于汉堡的Wedel和海德堡的Plankstadt。该公司在其Plankstadt工厂生产片剂形式的治疗药物,用于麻醉,感染和疼痛控制,还用于治疗呼吸道,心血管和胃肠道疾病,肿瘤和中枢神经系统。该站点由两个彼此独立工作的工厂组成-S5干燥机工厂设有流化床干燥机,可处理各种片剂。然后将片剂运输到Cota48植物进行包衣。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号