...
首页> 外文期刊>Automatica >Medium term scheduling of a hydro-thermal system using stochastic model predictive control
【24h】

Medium term scheduling of a hydro-thermal system using stochastic model predictive control

机译:基于随机模型预测控制的水热系统中期调度

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A multistage stochastic programming formulation is presented for monthly production planning of a hydro-thermal system. Stochasticity from variations in water reservoir inflows and fluctuations in demand of electric energy are considered explicitly. The problem can be solved efficiently via Nested Benders Decomposition. The solution is implemented in a model predictive control setup and performance of this control technique is demonstrated in simulations. Tuning parameters, such as prediction horizon and shape of the stochastic programming tree are identified and their effects are analyzed.
机译:提出了一个多阶段随机规划公式,用于水热系统的每月生产计划。明确考虑了来自水库流量变化和电能需求波动的随机性。该问题可以通过嵌套Benders分解有效地解决。该解决方案在模型预测控制设置中实施,并且该控制技术的性能在仿真中得到了证明。确定诸如预测水平和随机规划树的形状之类的调整参数,并分析其影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号