首页> 外文期刊>Automation >Customised solution helps connect the Dudgeon Offshore Wind Farm
【24h】

Customised solution helps connect the Dudgeon Offshore Wind Farm

机译:定制解决方案可帮助连接Dudgeon海上风电场

获取原文
获取原文并翻译 | 示例
       

摘要

Harting Customised Solutions (HCS) has been working with Siemens to create a new way of installing the cabling and switchgear for offshore wind turbines, in the process saving installation time and providing the extra project management flexibility needed when working in some of the world's most difficult sea conditions The Dudgeon Offshore Wind Farm is one of the biggest and most exciting energy projects currently under construction in Europe. The £1.5 billion project will harness offshore wind to generate 402MW of power for more than 410,000 UK homes. Located about 24 miles off the North Norfolk coast, the project is led by companies Statoil and Statkraft, and Masdar.
机译:Harting Customized Solutions(HCS)一直在与西门子合作,以一种新的方式来安装海上风机的电缆和开关设备,从而节省了安装时间,并为在世界上最困难的地区工作提供了额外的项目管理灵活性。海洋条件Dudgeon近海风电场是欧洲目前正在建设的最大,最令人兴奋的能源项目之一。这项耗资15亿英镑的项目将利用海上风能为英国的410,000多个家庭发电402MW。该项目位于北诺福克海岸约24英里处,由Statoil和Statkraft公司以及Masdar公司领导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号