首页> 外文期刊>Building research & information >The design coordination role at the pre-construction stage of construction projects
【24h】

The design coordination role at the pre-construction stage of construction projects

机译:The design coordination role at the pre-construction stage of construction projects

获取原文
获取原文并翻译 | 示例
           

摘要

The importance of the concept of prevention through design (PtD) to the alleviation of the problem of poor health and safety (HS) management in the construction industry is widely acknowledged. It has been adopted in the regulatory framework for HS in the UK construction industry through the Construction Design and Management Regulations 2015 (CDM 2015) which place on the project client obligations with emphasis on coordination of HS at the pre-construction stage of the project by a client-appointed 'Principal Designer' (PD). Unfortunately, research into the implementation of CDM 2015 into actual practice at the pre-construction stage has been patchy. The paper reports, with respect to the PD role, on part of research undertaken to respond to this gap. It involved surveys of clients and practitioners via fourteen focus group discussion sessions with over eighty participants to develop knowledge and understanding of the PD role. The research issues included: appointments to the role; structures for discharge of the role; day-to-day functions of the PD; remuneration arrangements; and common challenges regarding the PD.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号