首页> 外文期刊>Highways >How to get ahead in road maintenance
【24h】

How to get ahead in road maintenance

机译:如何在道路养护方面取得领先

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The impact of increasingly volatile and extreme weather conditions is showing up on our roads and creating year-round risks and responsibilities. While the wetter conditions and cold snaps of winter usher in a new wave of potholes each year, summer temperatures in excess of 40 degrees -which some parts of the UK saw last year - are melting the very ground we drive on. This is a vicious cycle of degradation, and a short-term focus on remedial road work is not enough. The national government, local councils, and contractor stakeholders all share a responsibility to climate-proof our highways and futureproof asset management strategies, operating on a principle of 'sustainability through durability' that can accommodate weather extremes and lower the cumulative maintenance load overtime.
机译:日益动荡和极端的天气条件的影响正在我们的道路上显现出来,并造成全年的风险和责任。虽然冬季的潮湿条件和寒流每年都会迎来新一波的坑洼,但夏季温度超过40度 - 英国一些地区去年看到 - 正在融化我们行驶的地面。这是一个退化的恶性循环,短期内只关注补救性道路工程是不够的。国家政府、地方议会和承包商利益相关者都有责任使我们的高速公路和面向未来的资产管理战略免受气候影响,本着“通过耐用性实现可持续性”的原则运作,可以适应极端天气并降低累积的维护负荷。

著录项

  • 来源
    《Highways》 |2023年第3期|32-34|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类 公路运输;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号