首页> 外文期刊>Water well journal >END OF A LONG DAY
【24h】

END OF A LONG DAY

机译:END OF A LONG DAY

获取原文
获取原文并翻译 | 示例
           

摘要

A crew from from Dos Palos Well Drilling prepares to head back to the shop after a long day of drilling a domestic well just a few miles from its facility. The well was drilled 150 feet with a 978-inch borehole and cased 140 feet with 5-inch PVC. The filter pack extends from below the casing and up to 100 feet below grade. The remaining annulus is sealed through a tremie pipe with high-solids bentonite grout to the surface. All of the work was completed by a single crew in a day that started at 6 a.m. The crew worked hard as the weather forecast called for rain two days later. The Dos Palos region used to be swampland and the top soil is hard black clay that turns to mud when hydrated, meaning vehicles still on the jobsite would have certainly been stuck. Dos Palos Well Drilling is located in Dos Palos, California, and has been in business for more than 35 years. Photo courtesy Michael Merriman, owner, Dos Palos Well Drilling.

著录项

  • 来源
    《Water well journal》 |2023年第5期|4-4|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号