首页> 外文期刊>Australian Resources and Energy Law Journal >ANVIL HILL COAL PROJECT APPROVED BY NSW PLANNING MINISTER
【24h】

ANVIL HILL COAL PROJECT APPROVED BY NSW PLANNING MINISTER

机译:新南威尔士州规划部长批准的安希尔山煤炭项目

获取原文
获取原文并翻译 | 示例
       

摘要

The Director-General was concerned to ensure that the proponent's GHG initiatives were certain and referable to clear targets. While stopping short of setting specific emission reduction targets, the Minister imposed conditions which require the proponent to: prepare and implement an Energy Savings Action Plan for the Project, monitor the GHG emissions generated by the Project, investigate ways to reduce GHG emissions generated by the Project, and report annually on its GHG monitoring and abatement measures. Notably, the monitoring, investigation and reporting obligations do not expressly include downstream GHG emissions.
机译:总干事担心要确保支持者的温室气体倡议是确定的,并可参考明确的目标。部长在未设定具体的减排目标的同时,强加了条件,要求支持者:为项目准备和实施《节能行动计划》,监测项目产生的温室气体排放,研究减少温室气体排放的方法。项目,并每年报告其温室气体监测和减排措施。值得注意的是,监测,调查和报告义务并未明确包括下游温室气体排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号