...
首页> 外文期刊>Energy Argus petroleum coke >Keystone fow increase temporary: TC Energy
【24h】

Keystone fow increase temporary: TC Energy

机译:Keystone fow increase temporary: TC Energy

获取原文
获取原文并翻译 | 示例
           

摘要

TC Energy will perform testing on its Keystone Pipeline system starting in November that will boost throughputs temporarily, rather than permanently increasing capacity. No new service for Keystone was ofered as the testing is a short-term activity to evaluate the operational performance and reliability of the system, the Calgary-based company clari-fed on 7 October.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号