首页> 外文期刊>Australian stainless >STAINLESS UPGRADE ON TRACK FOR RAIL STATIONS
【24h】

STAINLESS UPGRADE ON TRACK FOR RAIL STATIONS

机译:铁路车站的不锈钢升级

获取原文
获取原文并翻译 | 示例
       

摘要

When ASSDA Accredited Fabricator Bridgeman Stainless won a tender to supply stainless steel balustrades for Queensland Rail, supplying quality material with excellent fabrication techniques was at the forefront of their mind. The upgrade of Oxford Park and Grovely rail stations in Brisbane's North West was a 12-month project, headed by Arup and Moggill Constructions, and included significant use of stainless steel for the hand rails and balustrades. Director Len Webb says the job was an excellent opportunity to showcase stainless steel at its best, rather than reverting to cheaper, less reliable material and fabrication techniques.
机译:当ASSDA认可的制造商布里奇曼不锈钢公司(Bridgeman Stainless)赢得为昆士兰铁路公司提供不锈钢栏杆的招标时,他们的首要任务就是提供具有出色制造技术的优质材料。布里斯班西北部的牛津公园和格罗夫利火车站的升级是一个为期12个月的项目,由Arup和Moggill Constructions牵头,其中包括大量使用不锈钢作为扶手和栏杆。主任伦·韦伯(Len Webb)表示,这项工作是展示不锈钢最佳状态的绝好机会,而不是转而使用更便宜,更不可靠的材料和制造技术。

著录项

  • 来源
    《Australian stainless》 |2008年第42期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 金属材料;
  • 关键词

  • 入库时间 2022-08-18 10:22:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号