首页> 外文期刊>RIBA journal >Achievement and ambition
【24h】

Achievement and ambition

机译:Achievement and ambition

获取原文
获取原文并翻译 | 示例
       

摘要

Around this time last year, I set out my presidential priorities. These have underpinned our Biennial Action Plan 2022-23 endorsed by RIBA Council and Board that sets the focus for the organisation during my presidency. These areas include the issues that matter most to our members: Access to Architecture, addressing PII and carbon, increasing membership engagement, and ensuring our institute is in the right shape to deliver what our members and society need. First I'll focus on the biggest issue of our time: the climate emergency. RIBA representatives used COP27 last October to discuss architects' vital role in addressing the climate emergency, emphasising the importance of low energy buildings and the significance of retrofitting existing stock. On the theme of climate change, the RIBA is working with leading industry bodies to develop a UK Net Zero Carbon Buildings Standard that will enable industry to robustly prove that built assets are net zero carbon and in line with our nation's climate targets.

著录项

  • 来源
    《RIBA journal》 |2023年第1期|57-57|共1页
  • 作者

    Simon Allford;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号