首页> 外文期刊>Australian Farm Journal >BURDEKIN SALES ON HOLD: Sugar surge pushes four mills to limit
【24h】

BURDEKIN SALES ON HOLD: Sugar surge pushes four mills to limit

机译:BURDEKIN维持销售:糖价上涨推动四家制粉厂限制生产

获取原文
获取原文并翻译 | 示例
           

摘要

THE RELEASE of new cane-growing land in Queensland's Burdekin River Irrigation Area south-east of Townsville has been put on hold until a way can be found for the district's milling industry to handle the increased production. So dramatic has been the rate of development of irrigation land for sugar production in the Lower Burdekin since the Burdekin Falls Dam was built in 1987 that the region's four CSR-owned mills are now stretched to the limit.
机译:汤斯维尔东南部的昆士兰州Burdekin河灌溉区的新的甘蔗种植土地的发布已经暂停,直到找到该地区的制粉业解决增加产量的方法为止。自Burdekin Falls大坝于1987年建成以来,下Burdekin的制糖用灌溉土地的发展速度如此之快,以至该地区四个CSR拥有的磨坊如今已达到极限。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号