...
首页> 外文期刊>Process & Plant Engineering >LT completes concurrent multi plant Shutdowns at HPCL's Mumbai Refinery during peak of second wave of Covid-19
【24h】

LT completes concurrent multi plant Shutdowns at HPCL's Mumbai Refinery during peak of second wave of Covid-19

机译:LT completes concurrent multi plant Shutdowns at HPCL's Mumbai Refinery during peak of second wave of Covid-19

获取原文
获取原文并翻译 | 示例
           

摘要

The Modification, Revamp & Upgrade (MRU) Business Unit of L&T Heavy Engineering has successfully completed the projects it bagged as a part of HPCL's ambitious Mumbai Refinery Expansion Project (MREP). The project includes planned capacity expansion from 7.5 MMTPA to 9.5 MMTPA, producing BS-VI compliant petrol and high-speed diesel. The broad scope of this multidisciplinary project involved replacement/modification/dismantling of more than 180 Nos. Critical equipment, 130,000 ID-Fabrication of pipe spools and other components, Structure fabrication and erection, Piping Erection & Dismantling, associated Electrical & Instrumentation work and Civil work.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号