...
首页> 外文期刊>Australian Journal of Mining >QR locos sail into Brisbane
【24h】

QR locos sail into Brisbane

机译:QR locos驶入布里斯班

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

THE TWO locomotives arrived at the wharves in Brisbane and were unloaded after a long voyage from Germany, where they were built by Siemens in their Munich factory They're part of QR's 650 million dollars new rollingstock project and will be put into service in the Goonyella rail system later this year. QR CEO Lance Hockridge said the locomotives' arrival has been highly anticipated as QR moves to improve its performance in the Goonyella system. "We have 20 locos being built in Munich and a further 25 scheduled for production in 2009.
机译:这两辆机车到达布里斯班的码头,经过一段长时间的航行,从德国卸下,由西门子在慕尼黑的工厂建造。这是QR公司6.5亿美元新机车项目的一部分,将在Goonyella投入使用。铁路系统今年晚些时候。 QR首席执行官兰斯·霍克里奇(Lance Hockridge)表示,随着QR采取行动提高其在Goonyella系统中的性能,机车的到来已受到高度期待。 “我们在慕尼黑有20座火车头正在建造,另外25座计划于2009年生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号