...
【24h】

Shell facing wait at Prelude

机译:Shell facing wait at Prelude

获取原文
获取原文并翻译 | 示例
           

摘要

SHELL'S troubled Prelude floating liquefied natural gas development off the coast of Western Australia could be offline for some time following several general directions issued by Australia's offshore safety regulator. Output was halted last month after an electrical fire on 2 December in an enclosure housing batteries for backup power resulted in a complete loss of Prelude's power. For several days, Shell was only able to restore "unreliable and intermittent power availability", affecting the habitation and working conditions of the crew.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号