首页> 外文期刊>Highways >ALARM survey 2023
【24h】

ALARM survey 2023

机译:2023 年警报调查

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The local roads maintenance backlog in England and Wales for 2023 has hit a record £14bn, an increase of 11. After punishing levels of inflation this year, the annual shortfall between current carriageway funding levels and what is needed to prevent further decline jumped to £1.3bn in 2022-2023 - an increase of 20, which is roughly the level of inflation many argue the highways sector has recently faced. Authorities said this year they only received around two-thirds of the amount they would have needed to maintain the network to their own targets.
机译:2023 年英格兰和威尔士当地道路维护积压已达到创纪录的 140 亿英镑,增长了 11%。在经历了今年的通货膨胀之后,2022-2023 年,当前车道资金水平与防止进一步下降所需的资金之间的年度缺口跃升至 13 亿英镑——增长了 20%,这大致是许多人认为高速公路行业最近面临的通货膨胀水平。当局表示,今年他们只收到了维持网络达到自己目标所需金额的三分之二左右。

著录项

  • 来源
    《Highways》 |2023年第3期|6-7|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类 公路运输;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号