...
首页> 外文期刊>Australia's Paydirt >Mining troubles, milling wins for Bass
【24h】

Mining troubles, milling wins for Bass

机译:采矿麻烦,铣削为Bass赢得了胜利

获取原文
获取原文并翻译 | 示例
           

摘要

Bass Metals Ltd is looking to raise $25 million as it attempts to overcome grade issues and an influx of water into the deeper levels of its Fossey underground base metal mine in Tasmania. The Perth-based miner went into a trading halt on July 14 as it put together the re-financing package - largely through a convertible debt structure - designed to alleviate the pressures that built up throughout June due to operational problems. The company said the production delays and shortfalls incurred through dewatering issues and lower than anticipated grades had cost the company around $8 million for the June quarter.
机译:Bass Metals Ltd希望筹集2500万美元,因为它试图克服品位问题和水流入塔斯马尼亚州Fossey地下贱金属矿的更深层。总部位于珀斯的这家矿商在7月14日陷入停业,因为它筹集了重新融资方案-主要是通过可转换债务结构-旨在减轻因运营问题而在整个6月积累的压力。该公司表示,由于脱水问题而导致的生产延误和短缺以及等级低于预期的水准,使该公司在6月季度损失了约800万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号