...
首页> 外文期刊>Australia's Mining Monthly >SALLY MALAY CHOOSES SANDVIK
【24h】

SALLY MALAY CHOOSES SANDVIK

机译:马来人选择SANDVIK

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

SALLY Malay Mining has chosen Sandvik Mining and Construction Australia to supply its underground mining fleet at the new Sally Malay nickel-copper mine in Western Australia. The mine's 8 million dollars equipment fleet will include a Sandvik Axera D07-260 development jumbo, Toro 0010 and 1400 loaders, two Toro SOD haul trucks, a Solo 07 production drill and Sandvik-supplied Getman charge-up unit. Sally Malay operations director Mike Bohm said underground development would start in September, with decline development advancing to the first sloping level and ore production ramping up to full capacity as the existing openpit nears completion. Most underground ore will be produced using sub-level open sloping, with narrower eastern sections of the orebody to be extracted by up-hole bench sloping.
机译:SALLY马来矿业公司已选择山特维克矿业和建筑澳大利亚公司为其西澳大利亚州新的Sally Malay镍铜矿提供地下采矿车队。该矿的总价值为800万美元的设备车队将包括山特维克Axera D07-260开发巨型机,托罗0010和1400装载机,两辆托罗SOD拖运卡车,Solo 07生产钻机和由山特维克提供的Getman充电装置。萨利·马来(Sally Malay)运营总监Mike Bohm说,地下开发将于9月份开始,随着现有露天矿的接近完工,衰落的开发将推进到第一个倾斜的水平,并且矿石产量将达到满负荷生产。大多数地下矿石将使用分段露天倾斜法生产,而矿体较窄的东部部分将通过井上工作台倾斜法开采。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号