首页> 外文期刊>Australia's Paydirt >Resolute not waivering in Mali
【24h】

Resolute not waivering in Mali

机译:坚决不放弃在马里

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Resolute Mining Ltd remains confident its Syama gold project in Mali is on track with the company saying in early August that the ramp-up remained on schedule. Syama - 30km from the Cote d'lvoire border in the West African nation's far south - has been in the ramp-up stage since commissioning started in March. While the eight-week schedule has been missed, the company is still satisfied with progress, saying in a statement to the ASX on August 8 that all areas of the plant were operating consistently and in line with design criteria.
机译:Resolute Mining Ltd仍然对其在马里的Syama黄金项目充满信心,该公司在8月初表示,增产计划仍在按计划进行。自3月份开始调试以来,Syama距离西非国家最南部的科特迪瓦边界30公里,一直处于加速阶段。尽管错过了八周的时间表,但公司仍对进展感到满意,在8月8日向澳大利亚证券交易所发表的一份声明中说,工厂的所有区域都在持续运转并符合设计标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号