首页> 外文期刊>Electrical contractor >Paper Versus Computer Thinking about a digital estimating system?
【24h】

Paper Versus Computer Thinking about a digital estimating system?

机译:Paper Versus Computer Thinking about a digital estimating system?

获取原文
获取原文并翻译 | 示例
           

摘要

At some point in a company's growth, though, paper systems no longer make sense. They are prone to human error and eventually become cumbersome as company size increases. As a company procures more projects and employees, paper bookkeeping becomes more time-consuming, and the same is true for estimating. As a young estimator, I was in a position to evaluate computer versus manual estimating systems. At my first job as an estimator, the company subscribed to the Estimatic Electrical Estimating System. The takeoff was entered into a Teletype machine and sent to a mainframe computer in Denver. When the mainframe finished, the price and labor report was returned through the Teletype. This is how I learned to complete an estimate once the takeoff was finished.

著录项

  • 来源
    《Electrical contractor》 |2023年第3期|76-76|共1页
  • 作者

    Stephen Carr;

  • 作者单位

    Carr Consulting Services;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号