...
首页> 外文期刊>Australian Geomechanics >GROUND IMPROVEMENT TECHNIQUES FOR THE TREATMENT OF HIGH SPEED RAILWAY EMBANKMENTS
【24h】

GROUND IMPROVEMENT TECHNIQUES FOR THE TREATMENT OF HIGH SPEED RAILWAY EMBANKMENTS

机译:高速铁路路基的地面改良技术

获取原文
获取原文并翻译 | 示例
           

摘要

A high-speed railway project is currently being constructed between Rawang and Bidor in Peninsular Malaysia. The ground improvement methods adopted in the project are vibro replacement with stone columns, dry deep soil mixing (cement columns), geogrid reinforced piled embankments with individual pile-caps and removal/replacement works. This paper provides a detailed look into the vibro replacement with stone columns and dry deep soil mixing treatment methods while also providing an overview into the other treatment methods implemented in the high-speed railway project. The use of plate bearing tests and field instrumentation to monitor the performance of the stone columns and dry deep soil mixing ground treatment methods is also discussed.
机译:马来西亚半岛的拉旺和比多之间目前正在建设一个高速铁路项目。该项目采用的地面改良方法是:用石柱进行振动替换,干式深层土壤搅拌(水泥柱),带有单个桩帽的土工格栅加固桩路堤以及拆除/置换工程。本文详细介绍了用石柱和干燥的深层土壤混合处理方法进行振动替代的方法,同时还概述了高速铁路项目中实施的其他处理方法。还讨论了使用平板轴承测试和现场仪器来监测石柱的性能以及干燥的深层土壤搅拌地面处理方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号