首页> 外文期刊>Australian Geomechanics >BRIDGE APPROACH TREATMENT WORKS ON THE COOPERNOOK TO HERONS CREEK SECTION OF THE PACIFIC HIGHWAY UPGRADE1
【24h】

BRIDGE APPROACH TREATMENT WORKS ON THE COOPERNOOK TO HERONS CREEK SECTION OF THE PACIFIC HIGHWAY UPGRADE1

机译:太平洋高速公路升级版库恩努克至鹭爬坡段的桥梁方法处理工作1

获取原文
获取原文并翻译 | 示例
           

摘要

The Coopemook to Herons Creek Alliance was formed with the New South Wales Roads and Traffic Authority (RTA), Parsons Brinckerhoff and Thiess Contractors to design and construct the upgrade of 32.7 km of the Pacific Highway to dual carriageway between Coopernook and Herons Creek on the NSW Mid-North Coast. The upgrade works involved the construction of 15 new bridges, including two major river crossings over the Stewarts River and the Camden Haven River, which will duplicate the existing bridges. Both bridge approaches were constructed on embankments supported by a geotextile reinforced granular platform over soft ground adjacent to the existing bridges. Embankment movement, if significant, would not only affect the pavement performance but also impose additional loads on the piles supporting the adjacent bridge structures. To mitigate settlement effects, the bridge approach treatment works consisted of displacement columns to support the bridge approach embankments and a geotextile reinforced load transfer mat constructed on top of the displacement columns to assist in distributing embankment load. The main challenges were construction on soft ground, requirements to maintain design life of the existing bridges and the need for an accelerated construction technology for timely delivery of the project. This paper outlines the project, presents the case history of the bridge approach treatment works, and discusses analysis, design and construction monitoring.
机译:Coopemook至Herons Creek联盟由新南威尔士州道路和交通管理局(RTA),Parsons Brinckerhoff和Thiess承包商组成,旨在设计和建造将太平洋高速公路32.7公里升级为新南威尔士州Coopernook和Herons Creek之间的双车道中北部海岸。升级工程包括建造15座新桥梁,包括在斯图尔特河和卡姆登黑文河上的两条主要河流过境点,将与现有桥梁重复。两种桥都是在路堤上建造的,路堤由土工织物加固的颗粒状平台支撑,位于与现有桥梁相邻的软土地上。路堤的移动,如果很重要,不仅会影响路面性能,而且还会在支撑相邻桥梁结构的桩上施加额外的载荷。为了减轻沉降影响,桥梁进场处理工作包括支撑桥梁进场路堤的位移柱和在位移柱顶部构造的土工织物增强荷载传递垫,以帮助分散路堤荷载。主要挑战是在软土地上进行施工,维持现有桥梁的设计寿命的要求以及需要加快施工技术以及时交付项目的需求。本文概述了该项目,介绍了桥梁引水处理工程的案例历史,并讨论了分析,设计和施工监控。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号