GEOTECHNICAL INSTRUMENTATION & MONITORING PRELOAD PERFORMANCE - STAGE 3 EXPANSION KOORAGANG COAL TERMINAL, NEWCASTLE, AUSTRALIA

机译:土工仪器仪表和监测预紧力性能-第三阶段,澳大利亚纽卡斯尔扩展Kooragang煤炭总站

获取原文
获取原文并翻译 | 示例
           

摘要

Ground improvement to reduce post-construction settlements by way of staged preloading was undertaken prior to construction of the 1.4 km long coal pad and reclaimer berm at the Kooragang Coal Terminal. Geotechnical instrumentation including settlement monitoring plates, vibrating wire piezometers, inclinometers, earth pressure cells and a deep extensometer were utilised to monitor preload performance which was critical to the staging of construction works. Geotechnical monitoring was successfully utilised in difficult ground conditions to minimise potential delays to construction.
机译:在Kooragang煤炭码头建造1.4公里长的煤垫和取料器护堤之前,已经进行了地面改良,以分阶段进行预加载来减少施工后的沉降。利用包括沉降监测板,振弦式测压仪,倾角仪,土压力计和深层引伸计在内的岩土工程仪器来监测预压性能,这对于进行施工工作至关重要。在困难的地面条件下成功利用了岩土工程监测,以最大程度地减少潜在的施工延误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号