首页> 外文期刊>Australian Geomechanics >CONSTRUCTION OF ROCK SOCKETED PILES IN SYDNEY SANDSTONE TO MEET PERFORMANCE REQUIREMENTS1
【24h】

CONSTRUCTION OF ROCK SOCKETED PILES IN SYDNEY SANDSTONE TO MEET PERFORMANCE REQUIREMENTS1

机译:满足性能要求的悉尼砂岩嵌岩桩施工1

获取原文
获取原文并翻译 | 示例
           

摘要

Construction aspects are critical to ensure that the design intent / requirements are achieved through good construction methodology and quality control. This translates into ensuring the pile shaft/sidewalls are to a large extent free of crushed or smeared rock. Similarly, the base should be clear of any debris also. Presence of soft material / debris on the base of the pile will alter the load deflection characteristics. In order to meet the performance requirements through construction a strategy was formulated. The strategy included an advance programme of proof core drilling, use of appropriate drilling tools, reference to the available site investigation information and full-time geotechnical supervision.
机译:施工方面对于确保通过良好的施工方法和质量控制来达到设计意图/要求至关重要。这转化为确保桩身/侧壁在很大程度上没有碎石或污迹。同样,底座也应清除所有碎屑。桩基上存在柔软的材料/碎屑会改变载荷的偏转特性。为了通过构建满足性能要求,制定了策略。该策略包括一个先进的验证岩心钻探计划,使用适当的钻探工具,参考可用的现场调查信息以及专职的岩土工程监督。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号