首页> 外文期刊>The architects' journal >EUSTON, WE HAVE A PROBLEM
【24h】

EUSTON, WE HAVE A PROBLEM

机译:EUSTON, WE HAVE A PROBLEM

获取原文
获取原文并翻译 | 示例
       

摘要

An astonishing £289 million has already been spent on design fees for HS2's problematic -and now temporarily shelved -Euston station plans. The status of this work, mainly carried out by the Grimshaw, Arup and WSP team, is up in the air as the government and HS2 Ltd reconsider their proposals for the high-speed rail link's showpiece London terminus.

著录项

  • 来源
    《The architects' journal》 |2023年第4期|10-13|共4页
  • 作者

    Catherine Moore;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

  • 入库时间 2024-01-25 00:41:42
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号