An astonishing £289 million has already been spent on design fees for HS2's problematic -and now temporarily shelved -Euston station plans. The status of this work, mainly carried out by the Grimshaw, Arup and WSP team, is up in the air as the government and HS2 Ltd reconsider their proposals for the high-speed rail link's showpiece London terminus.
展开▼