The U.S. Army Corps of Engineers awarded an $80.14 million contract to Alstom Hydro U.S. Inc. to manufacture replacement runners for ten of the 16 original turbines at 2,457.3-MW Chief Joseph Dam. The project is on the Columbia River in north central Washington.
展开▼