【24h】

Carson Tahoe Hospital

机译:卡森塔霍医院

获取原文
获取原文并翻译 | 示例
       

摘要

Providing a competitive cost advantage compared to a steel special concentrically braced frame (SCBF) lateral system, Tilt-Up was selected for the 36,300 square metre facility because the concrete shear walls provide a longer lasting, more durable exterior that improves energy performance due to their inherent thermal mass. Further, the Tilt-Up shear walls at the exterior of the building provided flexibility for the current layout as well as for future renovations while also reducing the need for interior brace frames. This is the first concrete hospital/healthcare facility of its size to use Tilt-Up panels for the primary lateral force resisting system. Since the project was located in a high seismic region, the engineers worked with the contractor to design custom-welded hold-down details that are capable of transmitting the high shear and overturning forces as well as allow for the necessary erection tolerances.
机译:与钢制特殊同心支撑框架(SCBF)侧向系统相比,该系统具有竞争优势的成本优势,因此Tilt-Up被选为36,300平方米的设施,因为混凝土剪力墙提供了更长久,更耐用的外部外观,从而改善了能源性能固有热质量。此外,建筑物外部的倾斜式剪力墙为当前布局以及未来的装修提供了灵活性,同时也减少了对内部支撑框架的需求。这是规模如此之大的第一家混凝土医院/医疗机构,其主要的抗侧向力系统使用倾斜板。由于该项目位于地震高发地区,工程师与承包商合作设计了定制焊接的压紧零件,这些零件能够传递高剪切力和倾覆力,并具有必要的安装公差。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号