首页> 外文期刊>World pipelines >STATS Group completes six concurrent North Sea pipeline shutdown campaigns
【24h】

STATS Group completes six concurrent North Sea pipeline shutdown campaigns

机译:STATS Group completes six concurrent North Sea pipeline shutdown campaigns

获取原文
获取原文并翻译 | 示例
           

摘要

Pipeline technology specialist, STATS Group, has successfully completed the largest number of simultaneous pipeline isolation projects in its 23 year history. During the 2021 summer shutdown season, STATS supported six separate Tecno Plug isolation deployments in the UK North Sea, on pipelines ranging from 20 in. to 36 in. in diameter. The projects were on critical pipeline systems on behalf of multiple clients, with the isolation periods ranging from 10 to 45 days. Isolation activities were carried out onshore and offshore at various locations and included the use of STATS Remote Monitoring System, which allowed Tecno Plug isolation tools to be monitored continuously via satellite from STATS Remote Monitoring Centre in Kintore, Aberdeenshire. The satellite monitoring technology enables customers to reduce site Personnel on Board (POB) requirements on their oil and gas installations during breaking of containment activities, whilst still ensuring that the isolation status is continually monitored.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号