首页> 外文期刊>Australian Concrete Construction >500PLUS~R PREFAB Pile Cages--OneSteel Reinforcing Keeps Rail Project on Track
【24h】

500PLUS~R PREFAB Pile Cages--OneSteel Reinforcing Keeps Rail Project on Track

机译:500PLUS〜R PREFAB桩笼-OneSteel钢筋使铁路项目步入正轨

获取原文
获取原文并翻译 | 示例
       

摘要

The Wodonga Rail Bypass is part of the 612.8 million dollars North-East Rail Revitalisation Project. Jointly funded by the Australian Rail Track Corporation, and the Victorian and Commonwealth Governments, the project involved construction of a five kilometre dual track rail bypass, including 12 bridges situated in the Murray River floodplain, crossing local rivers and creeks. Contributing to the speed and cost-effectiveness of construction has been the inclusion of prefabricated steel piling cages and columns from OneSteel Reinforcing. Leading foundation construction company, Vibropile were commissioned for the construction of the bridges and worked collaboratively with OneSteel Reinforcing throughout the project.
机译:Wodonga铁路绕行计划是6.128亿美元的东北铁路振兴计划的一部分。该项目由澳大利亚铁路公司,维多利亚州和英联邦政府共同出资,建设了一条五公里的双轨铁路绕行公路,其中包括位于默里河洪泛区的12座桥梁,穿越当地河流和小溪。 OneSteel Reinforcing的预制钢打桩笼和立柱的加入有助于提高施工速度和成本效益。领先的基础建设公司Vibropile受委托进行桥梁建设,并在整个项目中与OneSteel Reinforcing合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号