More than 50 Rotork electro-℃hydraulic RCE actuators have been installed for an ongoing enhancement to the Malaysian rail network infrastructure. The Klang Valley Integrated Transit System serves the areas of Klang Valley and Greater Kuala Lumpur. There are two commuter rail lines within the metropolitan area, five subway lines, one busway line and, finally, two airport lines which connect to Kuala Lumpur International Airport and Sultan Abdul Aziz Shah Airport The Klang Valley Mass Rapid Transit project will see the addition of three new subway lines integrated into this network.
展开▼