Construction of the 315-mile (508-km) Gas Interconnection Poland-Lithuania (GIPL) pipeline has been completed, and partial capacity will be available beginning May 1, according to operator Amber Grid Corp. The pipeline is estimated to have a maximum potential capacity to ship 85 Bcf (2.4 Bcm) of gas annually in both directions, and a maximum potential capacity of 67 Bcf (1.9 Bcm) annually from Lithuania to Poland.
展开▼