...
首页> 外文期刊>Argus Gas Connections >Gazprom prioritises Nord Stream 2 feeder
【24h】

Gazprom prioritises Nord Stream 2 feeder

机译:俄罗斯天然气工业股份公司优先考虑Nord Stream 2喂料器

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Russian state-controlled Gazprom will concentrate on building a domestic pipeline to deliver Yamal peninsula gas for export through the planned Nord Stream 2 line. The firm welded the first joint of the Ukhta-Torzhok 2 pipe- line on 27 October at a ceremony attended by chief executive Alexei Miller and Sergei Gaplikov, acting president of Russia’s Komi republic. “Ukhta-Torzhok 2 will be ready to ship gas by 2019,” Miller says. The 45bn m~3/yr route will run for 970km from the Yamal peninsula to Gazprom’s northwest network.
机译:俄罗斯国家控制的俄罗斯天然气工业股份公司(Gazprom)将专注于建设一条国内管道,以通过计划中的Nord Stream 2管道输送亚马尔半岛天然气以供出口。在10月27日举行的仪式上,该公司焊接了Ukhta-Torzhok 2管道的第一条接头,首席执行官阿列克谢·米勒(Alexei Miller)和俄罗斯科米共和国代总统谢尔盖·加普利科夫(Sergei Gaplikov)参加了仪式。米勒说:“ Ukhta-Torzhok 2号将在2019年准备运输天然气。”从亚马尔半岛到俄罗斯天然气工业股份公司西北网络的这条450亿米3 /年的路线将长达970公里。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号