【24h】

Exchange

机译:Exchange

获取原文
获取原文并翻译 | 示例
       

摘要

I enjoyed Hana Loftus's plea for a plan-led planning system (RIBAJ October 2022), and I am in general agreement with its sentiment. However, in my experience developments approved at appeal in the absence of a 'five-year land supply' (5YLS) are very similar to those approved by planning committees having passed through the 'proper' local plan process. The lack of a 5YLS may allow an inspector to grant a permission on land outside a development boundary, but only if its location is otherwise 'sustainable', and to maximise their chances of success most housebuilders will comply with all other requirements placed on them by the local plan.

著录项

  • 来源
    《RIBA journal》 |2022年第10期|113-113|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号