...
首页> 外文期刊>Argus global LNG >Mozambique tests LNG ambitions
【24h】

Mozambique tests LNG ambitions

机译:莫桑比克测试LNG野心

获取原文
获取原文并翻译 | 示例
           

摘要

Mozambique’s LNG export projects could face further delays as a result of uncertainty caused by lower gas prices, new fiscal terms and the prospect that demand in key Asia-Pacific markets could be met by rival exporters. Italy’s Eni expects first LNG production in 2019 from a 2.5mn t/yr floating LNG facility based on gas from its offshore block 4 in the Rovuma basin. A larger initial 10mn t/yr capacity onshore LNG facility that Eni is co-developing with US independent Anadarko Petroleum, which operates offshore block 1, is expected to start up a year later. Anadarko, which had originally expected a 2018 start-up, has dropped its revised start-up expectation of 2019 (AGL, September, p15).
机译:莫桑比克的液化天然气出口项目可能面临进一步的延误,原因是天然气价格下降,新的财政条款以及主要的亚太市场的需求可以由竞争对手的出口商满足,从而带来不确定性。意大利的埃尼公司(Eni)预计将基于Rovuma盆地近海第4区块的天然气,以年产250万吨的浮式LNG装置在2019年进行第一批LNG生产。 Eni与美国独立的阿纳达科石油公司(Anadarko Petroleum)共同开发的一个更大的年产1000万吨/年的陆上LNG设施的初始产能,该工厂将在一年后启动。阿纳达科原本预计将在2018年启动,但已放弃其修订后的2019年启动预期(AGL,9月,第15页)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号