首页> 外文期刊>Argus global LNG >Kochi terminal to start even as pipeline stalls
【24h】

Kochi terminal to start even as pipeline stalls

机译:即使管道停滞,高知码头也将启动

获取原文
获取原文并翻译 | 示例
           

摘要

Indian state-owned LNG importer and terminal operator Petronet will finally open its 5mn t/yr Kochi LNG facility in mid-August. This is despite a delay in building a pipeline to customers and plans to renegotiate a long-term purchase contract signed with Australia’s Gorgon project, which may affect supplies to the facility. The Kochi terminal will receive its first commissioning cargo from Qatar’s Rasgas on 15 August after a year’s delay, even as the Tamil Nadu government and state-controlled distributor Gail are locked in a legal battle over building a pipeline connecting Kochi to consumers. The pipeline would pass through three southern Indian states (AGL, May, p9).
机译:印度国有LNG进口商和码头运营商Petronet最终将在8月中旬开设其年产500万吨的高知LNG工厂。尽管在建立通往客户的管道方面存在延迟,并且计划重新谈判与澳大利亚Gorgon项目签订的长期采购合同,这可能会影响工厂的供应。一年的延迟后,即使泰米尔纳德邦政府和国家控制的分销商盖尔(Gail)在建立一​​条连接高知与消费者的管道的法律之战中陷入僵局,高知码头也将在8月15日从卡塔尔的拉斯加斯(Rasgas)接收其第一批调试货物。该管道将​​穿过印度南部三个州(AGL,5月,第9页)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号