...
首页> 外文期刊>Argus FSU energy >Transneft offers link for yug line
【24h】

Transneft offers link for yug line

机译:Transneft提供yug线链接

获取原文
获取原文并翻译 | 示例
           

摘要

Transneft is ready to make part of a crude pipeline available for use as part of the proposed Yug - or "South" - product pipeline that subsidiary Transnefteprodukt (TNP) aims to build. The section runs from Krymsk in southern Russia's Krasnodar region to the port of Novorossiysk and is a spur from one of two lines running from the Tikhoretsk pipeline junction to the Black Sea port. The Yug project envis- ages launching an 8.7mn t/yr pipeline in 2016-17 for 10ppm sulphur diesel from Rosneft's Samara refineries, TNK-BP's 180,000 b/d Saratov plant and Lukoil's 195,000 b/d Volgograd refinery. It is still unclear whether the line would terminate at Novorossiysk or Tuapse, also on the Black Sea.
机译:Transneft准备将部分原油管道用作拟议的子公司Transnefteprodukt(TNP)旨在建设的Yug或“ South”产品管道的一部分。该段从俄罗斯南部克拉斯诺达尔地区的克里姆斯克到新罗西斯克港口,是从提科里采茨克管道连接点到黑海港口的两条线路之一的支线。 Yug项目设想在2016-17年度启动一条870万吨/年的管道,以购买来自Rosneft的萨马拉炼油厂,TNK-BP的180,000 b / d萨拉托夫工厂和Lukoil的195,000 b / d伏尔加格勒炼油厂的10ppm硫柴油。目前尚不清楚这条线是否将在黑海的新罗西斯克或图阿普斯终止。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号