...
【24h】

Brazil LATIN AMERICA

机译:巴西拉丁美洲

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Dredging works at the commercial quay of Parangua port have increased the wait faced by vessels waiting to dock to 35-40 days. The dredging works, intended to allow vessels of deeper drafts to dock, have suffered delays in recent days but are now set to resume on 17th January. This will shut down the sheds for a further three to four days, presumably with a corresponding increase in the length of time ships wait offshore.
机译:巴拉那瓜港口商业码头的疏works工程使等待码头停泊的船只的等待时间增加到35至40天。疏to工程本来是为了允许更深吃水的船只入坞,但在最近几天遭到了延误,但现在定于1月17日恢复。这将使棚屋再关闭三到四天,大概会相应增加轮船在海上等待的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号