X-energy and Kinectrics have launched a partnership to design, build, and operate a commercial-scale test facility to study the performance of the Xe-100 advanced small modular reactor in helium-based high-temperature, high-pressure operating conditions. The test facility, the site for which is to be announced sometime this summer, may be completed and operational by 2025.
展开▼