首页> 外文期刊>Indian Railways >MAHSR Project Brief
【24h】

MAHSR Project Brief

机译:MAHSR Project Brief

获取原文
获取原文并翻译 | 示例
           

摘要

1.1 Total length of the corridor: 508 km (348 - Gujarat + 4 -DNH + 156 - Maharashtra) 1.1 Maximum Operational Speed: 320 kmph 1.3 Time Taken: 2.07 hours (limited stops) 2.58 hours (all stops) 1.4 Total number of Stations: 12 Gujarat: 8 - Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand/Nadiad, Ahmedabad and Sabarmati Maharashtra: 4 - Mumbai (BKC), Thane, Virar and Boisar 2.1 Overall: - 97.54% 2.2 Gujarat: - 98.87% 2.3 DNH: - 100% 2.4 Maharashtra: - 94.55% 2.5 Status of Possession of Land in Maharashtra is 64.23% (Forest land included) 2.6 Status of Possession of Land in Maharashtra is 42% (excluding Forest land).3.Gujarat and Dadra and Nagar Haveli - 100% contracts for Civil, Bridges and Track for construction of viaduct, bridges, stations and track for the entire alignment i.e. 352 kms have been awarded.

著录项

  • 来源
    《Indian Railways》 |2022年第7期|36-36|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号