Cement plant operator Rohrdorfer is set to reduce the carbon footprint of its day-to-day operations following announcement of carbon dioxide(CO,)separation plant being built onsite.Scheduled to go into operation by the end of June 2022,the plant will capture two tonnes of CO,per day before being utilised in the regional chemical industry.The foundations for the plant-which is being built in cooperation with the Andritz Group-are already side of the Rohrdorfer cement works.
展开▼