Italy's gas grid operator Snam said it will invest 3.7 billion euros ($3.76 billion) in the national gas network to improve transport facilities from the south to the north of the country and boost supply from Africa. Speaking with analysts at a post-results conference call, CEO Stefano Venier said the project to build the Adriatic pipeline would be completed by 2027 "It is an extremely important project," Venier said.
展开▼