Abu Dhabi National Oil Co. (Adnoc) may double the size of its planned 9.6 million ton per year LNG export facility, in strategicallylocated Fujairah, under a phase two development in the future. Plans for the first phase development comprising two 4.8 million ton/yr liquefaction trains are well under way following the completionof front-end engineering design (Feed) works by McDermott International and the expected award of engineering, procurement andconstruction contracts this year. A second phase would see the construction of two additional trains of the same size which could be accommodated on the same plotallocated to the project, a person familiar with the project told Energy Intelligence.
展开▼