首页> 外文期刊>AT: Aufbereitungs-Technik >Optimization of the Production Flow at the EBAG Zinst Basalt Works with the Installation of the New Krupp Hard Rock Jaw Crusher
【24h】

Optimization of the Production Flow at the EBAG Zinst Basalt Works with the Installation of the New Krupp Hard Rock Jaw Crusher

机译:通过安装新的克虏伯硬式颚式破碎机,优化EBAG Zinst玄武岩厂的生产流程

获取原文
获取原文并翻译 | 示例
           

摘要

In the processing of hard rock, the coarse crusher is especially important for the further operation of the plant. As the coarse crusher used at the Zinst quarry worded by the Erste Bayerische Basaltstein AG (EBAG) was no longer able to meet increasing requirements, it was replaced in April 2002 by a hard rock jaw crusher supplied by ThyssenKrupp Fordertechnik. The new crusher is equipped with, amongst other things, a modern control and diagnosis system. A report on the success of the initial operation of the new crusher is gi en.
机译:在硬岩的加工中,粗碎机对于工厂的进一步运转特别重要。由于Erste Bayerische Basaltstein AG(EBAG)所说的Zinst采石场所使用的粗碎机不再能够满足日益增长的要求,因此2002年4月由蒂森克虏伯Fordertechnik提供的硬颚颚式破碎机取代了它。新型破碎机配备了现代化的控制和诊断系统。有关新破碎机初始运行成功的报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号