Testing time for Nanhai turbogenerator string

机译:南海汽轮发电机组试验时间

获取原文
获取原文并翻译 | 示例
           

摘要

The little German town of Gorlitz became the focus of heightened oil and gas industry attention recently.For it fell to Gorlitz,home of the Siemens industrial turbine test centre,to conduct the crucial test run of a turbogenerator string destined for service at a Chinese petrochemical plant.Although the Gorlitz facility has previously produced individual turbines up to 150MW in size,the Chinese turbogenerator string forms part of the largest single turboset order its has ever processed.The order,to supply four 60MW turbosets with condensers and a substantial spare parts package,including spare rotor and blade carriers,was received by Siemens in January 2003 from EPC contractor Sepco(Shandong Electric Power Construction).
机译:最近,德国小镇哥利兹(Gorlitz)成为油气行业日益关注的焦点。由于落在西门子工业涡轮机测试中心所在地的哥利兹(Gorlitz),进行了在中国石化服务的涡轮发电机组的关键测试尽管Gorlitz工厂以前曾生产过最大功率为150MW的单个涡轮机,但中国的涡轮发电机组是其已处理的最大单涡轮机组订单的一部分。该订单将为四台60MW涡轮机组提供冷凝器和大量备件包西门子于2003年1月从EPC承包商Sepco(山东电力建设)那里收到了包括备用转子和叶片支架在内的产品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号