10Installation of the subsea facilities and floatin production mooring system in the Galoc field, 65km northwest of Palawan Island, has been completed. Singapore-based Emas Offshore Construction & Production installed over 1200 of equipment on the seabed in a water depth o 290m using its DP2 heavy-lift accommodation and pipelay vessel Lewek Champion (pictured).
展开▼