...
首页> 外文期刊>The Northern Miner. >O3 Mining prefeasibility outlines 10-year mine life, $435M capex for Marban gold project
【24h】

O3 Mining prefeasibility outlines 10-year mine life, $435M capex for Marban gold project

机译:O3 Mining prefeasibility outlines 10-year mine life, $435M capex for Marban gold project

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

O3 Mining (TSXV: OIII; US-OTC: OIIIF) has completed a prefeasibility study for its 100% owned Marban gold project, demonstrating its potential to become the next gold producer in the prolific mining region of Val-d'Or, Que. The study, released on Sept. 6, showed robust project economics including a post-tax net present value (at 5% discount rate) of $463 million and post-tax unlevered internal rate of return of 23.2%.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号