首页> 外文期刊>Asian oil and Gas >Fortifying Forties
【24h】

Fortifying Forties

机译:强化四十年代

获取原文
获取原文并翻译 | 示例
           

摘要

Front-end engineering design for the new Forties field platform's topsides and bridge is being carried out in Altra Energy's Aberdeen headquarters, with SLP performing the FEED for the jacket in New Maiden, Surrey. Given successful delivery - due in August - and operator sanction, this work is expected to lead straight into detailed engineering and commissioning. If all goes to plan, installation of the new satellite platform is due in August 2012.
机译:新的Forties野外平台的顶部和桥梁的前端工程设计正在Altra Energy的阿伯丁总部进行,由SLP在萨里New Maiden进行夹克的FEED。鉴于成功的交付(将于8月到期)和操作员的认可,这项工作有望直接进入详细的工程和调试阶段。如果一切按计划进行,那么新的卫星平台的安装将于2012年8月开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号