首页> 外文期刊>Asian oil and Gas >Second pipeline dig begins
【24h】

Second pipeline dig begins

机译:开始第二次管道挖掘

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of the Second West-East Gas Pipeline, being undertaken by CNPC, has gotten under way on the same day in Xinjiang, Gansu, Ningxia and Shaanxi provinces, inaugurated on 22 February as part of China's eleventh five-year plan. This pipeline will join the Central Asia Gas Pipeline at Horgos in northwest China's Xinjiang Uygur Autonomous Region, transporting gas from Central Asia countries as well as that produced from the Tarim, Junggar, Tuha and Erdos basins to the Pearl River and Yangtze River delta areas and the central south part of China.
机译:由中国石油天然气集团公司承建的西气东输二线工程已于2月22日在新疆,甘肃,宁夏和陕西等省开工,这是中国“十一五”规划的一部分。这条管道将与位于中国新疆维吾尔自治区霍尔果斯的中亚天然气管道连接,从中亚国家以及塔里木,准gar尔,图哈和鄂尔多斯盆地生产的天然气输送到珠江和长江三角洲地区,以及中国中南部。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号