首页> 外文期刊>Asian oil and Gas >Bozhong second phase flow
【24h】

Bozhong second phase flow

机译:博中第二相流

获取原文
获取原文并翻译 | 示例
           

摘要

BOZHONG(BZ)25-1/25-1S IN Bohai Bay,China has come onstream,flowing more than 5000b/d of oil from 17 wells on platforms C and F.Thirty-eight additional wells are still to be completed under the second phase development,targeting a peak production of 15,000b/d.Operated by CNOOC,with a 83.8% stake,the Bozhong field is located in the southeastern part of Bohai Bay in 20m of water.
机译:中国渤海湾的BOZHONG(BZ)25-1 / 25-1S已投产,从C和F平台的17口井中每天产出超过5000b的石油。第二个井尚待完工38口渤中油田位于渤海湾东南部,距水面20m。该项目由中海油运营,持股83.8%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号